Urban trenchless solutions

来自 Helen September 23rd, 2026 21 浏览次数

1. Guangdong Water Resources Allocation Project around Beibu Gulf

Project Overview The Guangdong Water Resources Allocation Project around Beibu Gulf is a major livelihood water conservancy project for optimizing regional water resource distribution and securing water supply safety in the Beibu Gulf area. It serves as the backbone of the water safety guarantee system for the Guangdong-Hong Kong-Macao Greater Bay Area.

Shield Machine Type CRCHI Φ6440 Earth Pressure Balance Shield Machine

Tunnel Stratum Structure Weak & moderately weathered granite, weak & moderately weathered sandstone, fault breccia, etc. Maximum saturated uniaxial compressive strength: 110MPa ~173MPa

Cutting Tool Configuration 17-inch center double disc cutters + 37 sets of 18-inch single disc cutters + 24 pieces of face scrapers + 12 groups of edge scrapers

Tunneling Stratum Condition Completely weathered granite, moderately weathered granite, slightly weathered granite, mixed with fragmentary strongly weathered granite, silty clay, sandy clay, muddy silty clay, etc. Rock strength: 80~90MPa

Total Tunneling Distance 7723 meters

Tool Condition Good, normal wear


2. Shenzhen Metro Line 16

Tunnel Project between Pingshan Station and Liuliancun Station of Section 5 Work Zone

Project Overview Shenzhen Metro Line 16 is a key project of Shenzhen transportation infrastructure construction for the "Eastward Expansion", accelerating the construction of major transportation infrastructure in eastern Shenzhen. The tunnel section between Pingshan Station and Liuliancun Station features typical alternating hard-and-soft strata of weathered granite mixed with silty clay, requiring high-performance reshaping cutters for shield tunneling.

Shield Machine Type CRCHI Φ6440 Earth Pressure Balance Shield Machine

Opening Rate 33%, central opening rate: 38%

Cutting Tool Configuration 18-inch serrated disc cutters + scrapers

Tunneling Stratum Condition Completely weathered granite, moderately weathered granite, slightly weathered granite, mixed with fragmentary strongly weathered granite, silty clay, sandy clay, muddy silty clay, etc. Rock strength: 80~90MPa

Total Tunneling Distance 135 meters

Tool Condition Good, normal wear


3. Pingjiang Pumped Storage Tunnel Project

Project Overview The Pingjiang Pumped Storage Tunnel Project undertaken by Sinohydro Bureau 8 is a key national energy infrastructure project, and critical for accelerating the construction of pumped storage power stations in central China.

Shield Machine Type CRTEC Φ3630 TBM

Cutting Tool Configuration 17-inch center double disc cutters +19-inch single disc cutters

Tunneling Stratum Condition Medium-fine grained biotite monzogranite, biotite two-feldspar gneiss, granitic mylonite; Uniaxial compressive strength:80~140MPa

Average Tunneling Distance per Set of Tools 350~650 meters

Tool Condition Good, normal wear

4. Fuzhou Binhai Express Line

Project Overview Fuzhou Binhai Express Line constructed by China Railway 11th Bureau is a key transportation infrastructure project under Fuzhou’s strategy of "Advancing Southward", accelerating the construction of major transportation infrastructure around Fuzhou urban area.

Shield Machine Type CRTEC Φ8640 Single-shield TBM

Cutting Tool Configuration 19-inch disc cutters +17-inch center double disc cutters

Tunneling Stratum Condition Slightly weathered tuff (70~191MPa)

Average Tunneling Distance per Set of Tools 300~500 meters

Tool Condition Good, normal wear